Self-Cleaning Cushion Box EBM Cushion Boxes are designed for 40° to 50° of incline. The cushion box's discharge flange can be shipped loose, for field installation, or can be welded to fit customer's specifications.
1. Inspection Door
2. Replaceable Urethane-Lined Baffle
3. Grain Cushion
4. Discharge Flange
5. Round Or Square Models Available
When installing the EBM Cushion Box in the field proceed as follows: -Install so that the grain cushion (#3) is on the bottom -Align the cushion box and the discharge flange (#4) to the desired spout angle. -Attach the discharge flange to the cushion box. NOTE: If welding, pull the grain cushion back from the weld point. Be sure to follow safe welding practices NOTE: If self-tapping the discharge flange to the cushion box, be sure to seal the joint with silicone or equivalent to prevent water leaks.